Advance Tour Of San Francisco’s Soon-To-Be-Opened Transbay Terminal: West Coast “High Line” With Future High-Speed Travel

San Francisco is about to open its new $2.2 billion Transbay Terminal in downtown, current home to transbay bus service and future home to Caltrain and high speed rail. I had an opportunity to tour the facility last week ahead of its big public opening on August 12th (photos below).

The new terminal replaces a 1930s era bus depot that used to receive San Francisco’s since-shuttered intercity electric trains coming off the lower deck of the San Francisco-Oakland Bay Bridge. But the eight-year construction project has been mired in controversy over the typical delays and budget-busting that you see with big new infrastructure projects. And it also has been blamed for contributing to the nearby Millennium tower sinking and shifting, based on the dewatering practices used to excavate the site.

My takeaway from the tour? It’s a beautiful building that will really help smooth bus transportation access to this growing neighborhood south of Market Street. And the other immediate benefit will be the rooftop park, which is reminiscent of Manhattan’s highly successful “high line” walkway.

But the long-term payoff will be if and when Caltrain and High Speed Rail begin service to its now empty basement level — though that may take more than a decade to come to fruition.

Below are some photos I took from above, within, and below the site.

First up, the view of the 5.4 acre rooftop garden from the Transbay Terminal project office:

Here’s a small-scale model displayed in the project office:

Once inside the “Grand Hallway” of the terminal on the ground floor, the design team planned a mosaic floor covered in bright California poppies:

In the basement, possibly the most hopeful yet depressing sight: where Caltrain and possibly high speed rail trains will arrive and depart (probably in the 2030s), serving downtown San Francisco with thousands of passengers each day (pending the funding to complete these multi-billion dollar projects):

On the second floor, you’ll find the new bus bridge from the terminal on that level, taking buses directly onto the Bay Bridge for service to the East Bay and beyond:

And on the top floor, the aforementioned 5.4 acre rooftop park. Although it’s not as convenient to access as a street-level park, the concert series in this future bandstand and other activities should attract people, plus the nice views:

The half-mile bike- and scooter-free walkway around the top feels like a West Coast high line:

The park also features a fun access feature: a new gondola that will ferry people to the top from the street, hopefully in an efficient manner. The gondola won’t open until late August or early September:

Families with children will be welcome at this playground on the rooftop:

Overall, the terminal will be a real jewel for this part of San Francisco and a nice way to take transit. But it’s full potential won’t be realized until federal, state and local officials find the money first to extend Caltrain into it and then one day to bring in high speed rail to downtown San Francisco.

About